Not only did the sewing get finished and handed in but almost all of the weather boards have been ripped off the house, the inside of the walls dusted, insulation installed and sisalation placed on the outside. Neil has done most of this work, and we are both still having to get up a 6am as, apparently, that is the time puppies wake up (more on the puppies later).
Here are some photos, both before and after.
1 comment:
Looks amazing - what a great effort. Looks like its all wrapped up for Xmas.
Looks like Wednesday shoud be a good test for the insulation
Post a Comment